Commercial production step by step – from brief to broadcast master
How a commercial is made: the brief, choosing a production house, budget and rights, the PPM, the shoot, post-production and TV broadcasters’ delivery specs.

A commercial lasts a dozen or a few dozen seconds, but producing it is a full film process squeezed into a few weeks – with an additional layer of approvals on the brand and agency side. This guide is for people who commission or coordinate commercial production: marketers, agencies, producers, and line producers and production managers moving into advertising from features or documentaries. We show the successive stages, the documents produced at each of them and the points where time and money most often slip away.
The stages at a glance
| Stage | What is produced | Who approves |
|---|---|---|
| 1. Brief | objective, target group, the agency’s script or storyboard, budget, list of formats and media | advertiser |
| 2. Bid | director proposals, director’s treatment, budget, schedule | advertiser with the agency |
| 3. Pre-production | casting, locations, set design, costumes, shooting board, PPM document | advertiser and agency at the PPM |
| 4. Shoot | footage, shooting report | director; client and agency at the monitor |
| 5. Post-production | offline edit, colour grading, effects, sound post-production, voice-over, legal supers | advertiser and agency – in agreed rounds |
| 6. Broadcast | broadcast masters for broadcasters, online versions, rights sheets | broadcasters’ advertising sales houses (technical check) |
1. The brief: what the production house needs to know
A good production brief makes it possible to price the same film, not three different ideas of it. Besides the script or storyboard, it should contain:
- a list of all versions: lengths (e.g. 30, 15 and 6 seconds), language versions, vertical formats for social media,
- media, territory and broadcast period – the pricing of rights depends on these,
- the date of first broadcast and the deadlines for delivering materials to broadcasters,
- an estimated production budget,
- the brand’s requirements and the category’s legal restrictions (more on these below),
- information on who makes decisions on the client side and in how many rounds.
It is worth being open about the budget. The “Biała Księga – Przetarg na produkcję filmów reklamowych” (White Paper on tenders for commercial production) – a document prepared by industry organisations, including the SAR Marketing Communication Association – stresses that stating an estimated budget does not reduce the competitiveness of the bids, while its absence lengthens the selection and makes proposals harder to compare.
2. Choosing the production house and director
The “Biała Księga” is not law but a set of good practices; still, it puts the bidding stage in good order. Its most important recommendations:
- an initial market sounding (request for information, RFI) can be sent to many companies, provided it does not generate costs on their side,
- production houses should have 3 full working days for director proposals; the client selects between 2 and a maximum of 4 directors for the next stage,
- for director’s treatments – at least 5 working days from the directors’ briefing,
- the request for quotation (RFQ) goes to a maximum of 3 production houses, with 3–5 working days allowed for budgets,
- directors’ proposals are protected by copyright – the client should not pass a chosen treatment to other directors or production houses for pricing or development.
In practice this means that a thorough bidding stage takes about two to three weeks. Cutting it short rarely pays off: a hastily prepared quote later means annexes and disputes over scope.
3. The budget: what it contains and what changes it
A commercial’s budget has a similar structure to a film budget – crew, equipment, locations, set construction, costumes, cast, transport, catering, post-production, insurance, mark-up and overheads – only on a different scale and with greater weight given to rights. We describe the general principles of budgeting in the article how much does it cost to make a film. In advertising, the result is most affected by:
- the number of shooting days and whether a technical or prep day is needed,
- cast: the number of actors and extras, the possible involvement of a well-known person,
- where you shoot: a studio with a built set, a natural interior or an exterior requiring road occupation,
- post-production: effects, 3D animation, packshots, the number of versions and formats,
- music: an original commission, a library track or a licence for a well-known song,
- the deadline: working in rush mode costs more at every stage.
The “Biała Księga” also draws attention to payment terms: if the client expects terms longer than 30 days, the production house should show the cost of financing as a separate line in the budget. That way you can see how much the film itself costs and how much the contractor’s credit costs.
Rights and licences – the line you do not see on screen
A commercial budget should clearly define the scope of rights: fields of exploitation, period and territory. This follows directly from the Act on Copyright and Related Rights – a contract covers only the fields of exploitation expressly listed in it (Article 41(2)), and a licence that does not state otherwise entitles the licensee to use the work for five years in the territory of the country where the licensee has its registered office (Article 66). If the campaign is to cover several countries or run longer, this has to be written down.
Images are a separate matter. Disseminating a person’s image requires the consent of the person depicted (Article 81), and in advertising the consents of actors and models are usually priced according to media, period and territory. Extending a campaign by another year or adding television to an online campaign therefore means an additional payment – it is easier to negotiate it up front as an option than after the broadcast. Our legal services for productions help with preparing contracts with creators, cast and location owners.
4. Pre-production and the PPM
Once a bid has been chosen, the busiest stage begins: casting, location scouting, set and costume design, assembling the crew and equipment and, for city shoots, the permits we describe in the guide filming permits in public spaces.
All of this is brought together by the PPM (pre-production meeting) – a meeting of the advertiser, agency, director and producer, usually a few days before the shoot. At the PPM the following are approved:
- the final script and shooting board (shot by shot),
- the cast, including back-ups,
- locations or set design, props, costumes, make-up,
- how the product is shown: hero products for the shoot, labels, the packshot,
- the schedule of the shooting day and post-production, with approval deadlines,
- the list of versions and formats to be delivered.
The decisions from the PPM are worth writing up and circulating. They are the point of reference in every later discussion about whether a change is an amendment within the budget or a new order.
5. The shooting day
A commercial set works like any other – with a call sheet, a unit manager and an agreed order of the day (see how to organise a film shoot) – but it has two particular features. First, agency and client representatives sit at the monitor, and comments should reach the director through one agreed channel: usually via the agency creatives and the producer. Second, there are few days, so every hour of delay costs more than on a feature. If food or drink appears in the frame, product styling and spare stock are planned separately.
Overtime, extra shots “just in case” and changes to what was agreed at the PPM are typical sources of overruns. The rules for approving them – who on the client side can agree to an additional cost – are best settled before the first slate.
6. Post-production and approval rounds
The order of work is fixed: offline edit, approval of the edit, and only then colour grading, effects, online edit, music, voice-over and the sound mix. Every change to the edit after “picture lock” triggers corrections in all the subsequent links of the chain, which is why the number of approval rounds should be written into the schedule.
This is also the stage when cut-downs, social media formats, subtitles and legal supers are produced. We write about this stage in more detail on the post-production page.
7. Broadcast masters: broadcasters’ requirements
A finished commercial must pass a technical check at the channel’s advertising sales house. The requirements of the main Polish broadcasters are similar but not identical (as of November 2026, based on the published specifications):
| Broadcaster | Delivery method | Key parameters |
|---|---|---|
| Biuro Reklamy TVP | the broadcaster’s electronic system | MXF OP1a, XDCAM HD422 50 Mb/s, 1920×1080, 1080i/25, loudness −23 LUFS, true peak up to −1 dBTP |
| TVN Media | only via Transfer TVN Media | MXF OP-1a or MOV, XDCAM HD422, 1920×1080, loudness −23 LUFS (EBU R128) |
| Polsat Media | AdFlow platform | loudness −23 LUFS ±1 LU (EBU R128); a copyright sheet together with the material |
Three practical notes. The loudness of advertisements is governed by a regulation of the Krajowa Rada Radiofonii i Telewizji (National Broadcasting Council, KRRiT) – an advertisement may not be louder than the programmes around it – and the −23 LUFS value comes from broadcasters’ specifications based on the EBU R128 recommendation. Deadlines are rigid: Polsat Media, for example, requires material to be delivered no later than 10:00 on the fifth working day before broadcast. Finally, the rights sheet (music authors, performers, producer) is a document without which the channel may not accept the commercial – the data for it is collected during post-production.
Masters for online and cinema have separate platform and network requirements; it is worth ordering them together with the TV masters so you do not have to go back to a closed project.
Legal restrictions you need to know before the script
Some product categories have their own advertising rules. The most important examples (this is not a complete list):
- alcohol – only beer advertising is permitted, with restrictions on content (among others, no minors and no association with success or relaxation) and broadcast times: on television, radio and in cinemas not between 6:00 and 20:00,
- medicines – prescription medicines may not be advertised to the public, and advertisements for other medicines may not feature public figures, scientists or people with medical or pharmaceutical training, or people suggesting that they have such training,
- medical devices – separate rules under the Medical Devices Act, including a mandatory warning with set wording and display time,
- gambling – advertising is prohibited in principle; the exception for legal betting is subject to conditions,
- tobacco products and e-cigarettes – advertising is prohibited,
- messages aimed at children – restrictions under the Broadcasting Act,
- collaboration with online creators – recommendations of the President of UOKiK (the Office of Competition and Consumer Protection) on labelling advertising content.
The script’s compliance with these regulations is checked before the shoot. Fixing a finished film because the voice-over reads the warning too briefly is one of the most expensive corrections in the industry.
Commercials and public production support
Feature producers often ask whether a commercial can benefit from the 30% incentive. It cannot: the Act on financial support for audiovisual production excludes advertising works, and PISF programmes do not cover them. A commercial’s budget comes entirely from the advertiser, which makes a good budget all the more important.
Music videos and corporate films are made according to the same scheme, usually with a shorter bidding stage and a simpler approval process. The rules on rights, images and permits remain the same.
Checklist before talking to a production house
- Script or storyboard in an internally approved version
- List of versions: lengths, languages, formats (16:9, 9:16, 1:1)
- Media, territory and broadcast period – for pricing the rights
- Date of first broadcast and deadlines for delivering masters to broadcasters
- Estimated production budget
- The category’s legal restrictions and mandatory supers
- Decision-maker and number of approval rounds on the client side
- Requirements for the product on set (hero products, labels, packshot)
- Expected payment terms
What next
Whether you have a finished script or just an outline of a campaign, the best next step is a short conversation about scope: how many versions, which media, when it airs. On that basis a realistic schedule and a budget with the rights spelled out can be prepared.
Holly Łódź makes commercials and corporate films as full film production – with production management, crew, equipment and post-production – or as production services for agencies and production houses that need support in Łódź and the region. Write to us and send your brief – we will reply with the questions that will let us price it properly.
This article is for information only. Advertising regulations and broadcasters’ specifications change – check the current requirements before production and consult a lawyer on contentious matters.
Sources
- “Biała Księga – Przetarg na produkcję filmów reklamowych” (White Paper on tenders for commercial production): https://skutecznyprzetarg.pl/biala-ksiega
- Act of 4 February 1994 on Copyright and Related Rights, Articles 41, 66 and 81
- Regulation of the National Broadcasting Council (KRRiT) of 30 June 2011 on the conduct of advertising and teleshopping in radio and television programmes (consolidated text: Journal of Laws 2014, item 204)
- Technical specifications and sales terms: Biuro Reklamy TVP, TVN Media (https://transfer.tvnmedia.pl), Polsat Media (https://adflow.polsatmedia.pl)
- Act on Upbringing in Sobriety and Counteracting Alcoholism, Pharmaceutical Law, Medical Devices Act, Gambling Act, Broadcasting Act
- Act of 9 November 2018 on financial support for audiovisual production
FAQ
Frequently asked questions
01How long does it take to produce a commercial?
From the approved script to the finished broadcast master usually takes from a few weeks to around fifteen weeks – depending on the scale of the shoot, the casting and the scope of post-production. The bidding stage also takes time: the industry’s “Biała Księga” (White Paper) recommends at least 5 working days for director’s treatments and 3–5 working days for budgets.
02What does the cost of a commercial depend on?
Above all on the number of shooting days, the cast and the scope of image rights, the locations or set construction, the scale of post-production (especially effects and animation) and the music. A significant part of the budget goes on licences: the broader the fields of exploitation, the longer the period and the larger the broadcast territory, the higher the fees.
03How many production houses should you send a request for quotation to?
The “Biała Księga” on tenders for commercial production, prepared by industry organisations, recommends sending the request for quotation (RFQ) to a maximum of three production houses. Preparing a treatment and a detailed quote is labour-intensive, so wider tenders lower the quality of the bids.
04In what format is a commercial delivered to television?
Each broadcaster publishes its own specification. The common denominator of the main Polish advertising sales houses is HD 1920×1080 files in the XDCAM HD422 codec and loudness of −23 LUFS in line with the EBU R128 recommendation (as of November 2026). Before mastering, always download the current specification of the channel on which the commercial will air.
05Can you get a 30% rebate on the cost of producing a commercial?
No. The Act on financial support for audiovisual production excludes advertising works from the incentive system, and Polish Film Institute (PISF) grants do not cover them either. A commercial is financed entirely by the advertiser.